Specifications include, but are not limited to: 1. The Firm shall furnish all supervision, personnel, labor, materials, tools, minimum equipment and services, including work zone traffic control, to perform and complete all work required for the Project’s Utility Investigation. 2. The survey shall include the location of any utilities located on the Project site and extend a minimum of 50’-0” beyond the boundary of the properties and 50’-0” beyond perimeter roads and as indicated on the attached plan. The survey shall also include the extensions of all utility Rightof-Ways. 3. Firm shall complete a right-to-know request for any utility information that may be available within the municipal records. 4. The survey shall indicate all Rights-of-Way and easements adjoining or crossing the property. Include Right-of-Way information for any major roadway adjoining or crossing the property. 5. Contact PA One Call to obtain available utility information and plot information obtained from PA One Call on the survey plan. Provide PA One Call documentation along with final survey. 6. Utility survey of tract (Parcel #53-00-07964-00-2, 53-00-07396-10-2, 53-00-07396-10-3) for all surface identifiable utilities. Survey of storm and sanitary pipes flowing to and from the subject property shall be surveyed to the first identifiable landmark (i.e., storm inlet, sanitary manhole, etc.) off the property. All manholes, inlets, valve covers, meter pits and other appurtenances shall be verified. Survey shall also include identification of all pipe sizes, materials, and inverts. Locate all PA One Call markings. Attached are previously prepared site information. This information (as verified) shall be incorporated into the plan by the surveyor. 7. The Firm shall perform an ASCE Quality Level “B” utility scan. These utility location services will be performed by a variety of electromagnetic magnetic (EM), radio frequency (RF) and ground penetrating radar (GPR) equipment to determine the approximate horizontal position of subsurface utilities and to identify the potential for utility conflicts. 8. The Firm shall perform an ASCE Quality Level “A” utility scan to provide field investigation of existing underground utilities using soft dig methods and equipment to locate the utility in plan dimension and elevation below existing grade ONLY in areas as indicated on the attached plan. The results of investigation shall be measured and marked on the final, submitted plan. All Work shall be scheduled and executed to avoid interruption of utilities.