Specifications include, but are not limited to: SITE 1 – SOUTHEAST SHELBY (Shelby Site) (33° 5'14.40"N, 86°33'21.12"W) Radio Communications Tower – Provide and install a 300’ guyed tower. The tower and foundation must be properly designed and engineered to current standards and support current and future antenna structure needs. The tower must be designed to support two (2) 20’ 700/800MHz antennas with one at the 290’ centerline and one at the 270’ centerline, one (1) 18’ UHF antenna at 290’ centerline, two (2) microwave dishes with radomes, one (1) 4’ dish at 250’ centerline and one (1) 6’ dish at 250’ centerline, and future cellular carriers at the 200’ level and the 225’ level. All grounding must be to R56 Specifications. The current shelter, generator, propane tank, microwave dishes, and associated equipment are located at a leased site and must be moved to the proposed site. The vendor is responsible for all fees and permit costs associated with the tower installation, site construction, and electrical work. • Provide tower foundation design and calculations to support the tower and proposed loading. • Construct and Install foundation, grounding, and guy anchors for 300’ guyed communications tower. • The tower must have a climbing ladder with safety climb, lightning rod, waveguide ladder, and be hot dipped galvanized. • Supply and install FAA-approved LED tower lighting system per FAA specification AC70/7460 with remote I/O. • Provide and install two (2) 700/800 MHz Corporate Collinear 10.5dBd (CC807-11-P) or customer-approved equivalent, standoff mounts, and appropriate line kits. • Provide and install one (1) UHF Corporate Collinear 6dBd 450-512MHz (CC450-06-P) or customer-approved equivalent, standoff mount, and appropriate line kits. • Move and reinstall one (1) Bird Transmit TTA, Unistrut, and appropriate line kits. • Move and reinstall Andrew PAR6-PXA-A microwave dish and install pipe mount and appropriate line kits. • Move and reinstall the ValuLine VHLP4-11W microwave dish and install pipe mount and appropriate line kits. • The contractor is responsible for providing all necessary mounting brackets, hardline, waveguide, grounding kits, and connectors required. • The Contractor will be responsible for providing a report for line sweeps and antenna tests and shall help identify and repair problems with the coax or antenna if the initial test fails. • The Contractor will be responsible for dish alignment and optimization. • The Contractor will be responsible for the appropriate tower and compound warning signs. Radio Communications Compound – The communication compound should be turn-key. The contractor is expected to perform all site preparation, foundation-related construction, tower construction, grounding requirements, electrical, and finishing. • 11’-8” x 16’-6” Equipment Shelter Foundation • 10’-0” x 5’-0” Generator Foundation • 4’-0” x 10’-0” Fuel Tank Foundation • Cable Bridge and related waveguide • Provide and install electrical feed panel and H-Frame with a minimum of three (3) gang meter panel. • Provide and install electrical conduit and wiring for a 200-amp service to the shelter. • Move and install customer-owned 25Kw generator. • Provide and install electrical conduit, wiring, and communication lines for a 25Kw standby generator. • Move and install customer-owned 500-gallon propane tank. • Provide and install appropriate plumbing and communication lines for a 500-gallon propane tank. • Provide and install 60’-0” x 60’-0” x 8’-0” compound fencing with a 12’-0” drive-thru gate with appropriate grounding. • Provide and install 8’-0” tall fencing with a walk-thru gate for guy anchors with appropriate grounding. Fencing must be installed so there is a minimum of 15’-0” clearance from the ground to the guy wires to allow equipment to clear. • Fencing shall be vinyl coated – must be galvanized 9 gauge wire Bottom tension wire is required. 1 5/8” top rail schedule 40 pipe galvanized 2” line post schedule 40 pipe galvanized 3” terminal post and gate post schedule 40 pipe galvanized 1 5/8” schedule 40 pipe for all gate frames galvanized Three strands of galvanized barbed wire at the top All post to be concreted in place 24” deep minimum in a 9” diameter concrete minimum • Provide and install weed mat and gravel for the compound. • Provide and install all necessary grounding/grounding Halo and drops per R56 Specifications.