Specifications include, but are not limited to: 0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM; 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM; 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 120; 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 4; 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 20; 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM; 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM; 0008 120166 CHANNELIZER (SURFACE MOUNTED) (LEFT IN PLACE) EA 35; 0009 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 240; 0010 130100 JOB SITE MANAGEMENT LS LUMP SUM; 0011 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM; 0012 141103 REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE) LF 23,200; 0013 141120 TREATED WOOD WASTE LB 1,690; 0014 190185 SHOULDER BACKING TON 1,050; 0015 374207 CRACK TREATMENT LNMI 44; 0016 377501 SLURRY SEAL TON 470; 0017 390095 REPLACE ASPHALT CONCRETE SURFACING CY 63; 0018 390132 HOT MIX ASPHALT (TYPE A) TON 40,400; 0019 397005 TACK COAT TON 280; 0020 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 421,000...