Specifications include, but are not limited to: A. The delivery method for this project is a single-prime, General Construction, lump-sum project, including all general and electrical work as specified herein and indicated on drawings. B. These Construction Documents include Work limited to the existing Hennepin County Libraries (Plymouth, Maple Grove), include the following: 1. Demolition of existing heat pump units and associated piping as shown on plans. 2. Installation of water to water heat pump units. 3. Associated controls work and updates to existing mechanical system programming and graphics. 4. Associated electrical work for removal of existing heat pumps and installation of new heat pumps. 5. Perform Work under a stipulated sum contract with Owner in accordance with Conditions of Contract.