Specifications include, but are not limited to: * Operate the CCCSD solar drying basins according to the Operations Plan developed by CCWD (Attachment A1). Average monthly solids production has been 525,000 gallons per month. Basin II must be completely clean at the end of the dry season (October 31) and at the end of the Contract Term (June 30). It is anticipated that the Contractor will not be on-site during the wet weather months (November – March). Dry weather months are included in the Scope as an example. The period of work will be designated by CCWD based on weather conditions. CCWD will provide 14-day notice for commencement of operations and cessation of operations. Mechanical aeration/stirring of the water treatment residuals during the drying cycle is required for successful operation. * Furnish and operate decant pump assembly to withdraw clear decant water near the water surface. Any decant water transfer between basins or decant discharge to CCCSD must be attended to and monitored to prevent solids discharge into CCCSD’s sewer system. The contractor shall be subject to the CCCSD pretreatment requirements and agrees to take all reasonable measures to comply with CCCSD enforcement orders. The Contractor shall not discharge into the CCCSD wastewater collection and treatment system any substance categorized as hazardous. The CONTRACTOR shall furnish all necessary pumps, filters, floats, hoses, equipment fittings, power, and power connections. * Dried solids shall be loaded, hauled, and disposed of at the Republic Services – Keller Canyon Landfill in Pittsburg, California, or alternative sites TBD. CCWD will pay all disposal (tips) and administrative fees directly to the Republic Services – Keller Canyon Landfill in Pittsburg, California, or alternative sites. The contractor shall coordinate the timing of loading and hauling operations with Central Contra Costa Sanitary District (CCCSD)...