Specifications include, but are not limited to: The objective is to have a licensed, qualified, experienced electrical contractor knowledgeable in water control structures (pumps, gates, motors, etc.) to remove and install District supplied automatic transfer switches at the S-161A, S-164, S-96, S-96C water control structures. See attached site location map for location of each structure. Provide labor, equipment, tools, and materials to remove and replace the transfer switches at S-161A, S-164, S-96, S-96C water control structures. Contractor’s responsibilities: a. Mobilize to each site with appropriate staff, materials, and equipment. b. Perform lockout-tagout to disconnect electric power service to water control structure prior to performing work. c. Engage disconnects to shut down power to pump panels and terminate incoming power to entire station. d. Remove existing transfer switches at the S-161A, S-164, S-96, S-96C water control structures. See attached pictures for typical existing transfer switch installation (Figure 1). e. Install new District supplied automatic transfer switches at the S-161A, S-164, S-96, S-96C water control structures). See attached proposal for information on new automatic transfer switches to be installed, Exhibit 1 (transfer switches to be provided by the District). f. Provide and install conduit and wiring. g. Reconnect the existing controls. h. Re-energize water control structure. i. Test operation once repair installation is complete to ensure repair was successful.