Specifications include, but are not limited to: This is a removal and replacement of an existing boiler inside an existing nursery building. As the new boiler is wider than the existing interior door width, the installation may require creating an opening in the exterior wood siding and restoring to the original condition. Contractor shall connect existing gas and electrical connections to the new unit per the manufacturer’s specifications. Contractor shall provide a new permit to operate the boiler from SF DBI. See Attachment 1 for additional information. a) Remove and off-haul existing boiler. Existing concrete pad to remain. b) Furnish and install the following items per specifications below: i) Sioux SF-11G soil boiler, ii) 20’ steam hose that will attach to the soil carts, iii) temp control, iv) zone control, v) 2 soil carts with hydraulic rear dump and 2 stainless steel perforated soil cart floors. c) Complete Permit to Operate Boiler. d) Provide Start up and training.