Specifications include, but are not limited to: This project includes all labor, materials and equipment required to remove hazardous materials and perform general (non-structural) demolition work in Hawthorne, Glacier and Forest Halls at the SOU Cascade Residence Halls complex. The Cascade complex is located at 1450 Madrone Street on the SOU campus in Ashland. The work scope incudes: • Mold remediation in Hawthorne Hall. • Non-structural, non-ACM interior general demo (furnishings, casework, fixtures, floor coverings, doors, radiators, light fixtures & misc. items as noted in the drawings and specifications). • Demolition of non-ACM plumbing partitions as required to access ACM thermal insulation. • DEQ noticing and permits. • ACM removal including floor tile & mastic, thermal (pipe) insulation, HVAC fittings, fire doors and misc. Items as noted in the drawings and specifications. • Removal of florescent light fixtures & ballasts • Coordinate with Owner’s abatement consultant for specified tests and inspections. • Contractor to field verify all quantities and conditions before submitting a bid. All Hawthorne Hall work is included in the BASE BID. Glacier Hall work is ALTERNATE #1. Forest Hall is ALTERNATE #2. Refer to the Attachments for detailed information.