Specifications include, but are not limited to: • All associated concrete, structure, and soil removal and replacement in accordance with industry standards and permitting. Topsoil and seed existing grass areas. All materials not re-used shall be removed and disposed of. • Remove 2 (two) existing STP containment tanks, install 2 (two) containment chambers, and access gangways. Proper disposal of existing tanks is required. • Remove and replace all piping and ball valves to new transition chamber and from chamber to existing pipe at dock hinge. Install new piping transition chamber near dock (abandon existing). • Install piping pump sensor and connect to existing Automatic Tank Guage (ATG). Including all necessary conduit, wiring, and cabling. • Install new concrete pads around STP manways, replace all walkway concrete from pipe trenching, new concrete around steel existing access door on dock