Specifications include, but are not limited to: The State of Hawaii’s Division of Forestry and Wildlife (DOFAW) is seeking bids for constructing an ungulate-proof fence around Phase 1 of Parker Ranch’s Mauna Kea Reforestation Project, as well as associated tasks such as clearing the fence corridor and installing pedestrian and vehicle gates as needed. The successful bidder will enter a contract with the State of Hawaii from which fence projects will be executed with a State of Hawaii Purchase Order (PO). DOFAW will supply the following materials of the following specifications to complete fence installation, including: o 75” Woven Wire: 1775-6-12.5: 330-ft roll X 75” high tensile steel woven Bezinal or Galfan coated longlife or “X” knot hog wire fabric or equivalent o Apron: 832-6-12.5, 32” high tensile steel woven hinge lock hog wire fabric, Bezinal coated o T-133 galvanized steel posts: T-133 posts, 8.5 feet in length. Certified ASTM RR-F-221/3A. Galvanizing per ASTM 123, with anchor plate o Galvanized pipe for corner posts, anchors, in-line braces and/or line bosses will be a minimum 2 7/8” outside diameter (OD). Galvanized pipe for brace rails will be a minimum 2 3/8” OD and 10.5” long. Galvanized pipe for vehicle gate hinge posts will be a minimum of 3” OD. o Pipe Caps: Galvanized 2-7/8” pipe caps o H-brace Hardware: 2-7/8” Arrow Bracket Set o Fasteners: Clips, Bezinal coated. Minimum 11-gauge. 7 per T-post per panel o Pins: Concrete forming pins, 5/8” X 5/8” X various lengths (determined by substrate) o Smooth wire: 9-gauge straight wire Bezinal coated o Hog rings: 9 gauge, Bezinal coated o Pedestrian Gates o Vehicle gates: 8’x6’ mesh gates for 3-16’ double gate openings and several 8’ gate openings. Contractor shall meet with staff from DOFAW soon after the award, if any. Topics to be included at the meeting will be: ● Designation of responsible officials OFFER FORM OF-13 Please Upload; Keep Original ● Correspondence procedures ● Labor standard provisions ● Changes in specifications ● Payments to The Contractor ● Safety program ● ROD Sanitation SOP ● Communication ● Installation techniques ● Helicopter transport ● Proposed installation schedule