1. Removal of the exisng asphalt basketball court (approximately 106’ x 70’) 2. The exisng basketball goals shall remain in place. 3. Compacon of the exisng crushed stone aggregate and verificaon that the depth of the stone is a minimum of 4” in all areas. Add crushed stone as needed to meet 4” minimum. 4. Installaon of 2” minimum of asphalt base coat and 1.25” minimum of asphalt surface coat, maintaining 10’ from the top of the surface coat to the top of the rim on the basketball goal. 5. The asphalt shall be crowned to promote drainage and shall have no puddles of standing water deeper than .25” one hour aer rainfall. 6. Any damage to the adjacent walking trail, lawn, or any city owned property shall be repaired upon compleon of the paving. 7. The area of work shall be contained within temporary fencing or barriers during construcon.