Specifications include, but are not limited to: Each generator should crank automatically if there is a loss of line power. Three Fire Stations need to include: Minimum 20 KW, 240/120-volt single phase, propane powered with 24-hour fuel tank with sound attenuated weather enclosure with main breaker and remote annunciator. Cast in place concrete pad. Connect new generator to new automatic transfer switch to be provided and connected to existing electrical panel in building Station 41 and Station 24 need to include: Minimum 45 KW, 240/120-volt single phase, diesel powered with 24-hour fuel tank with sound attenuated weather enclosure with main breaker and remote annunciator. Cast place concrete pad. Connect new generator to new automatic transfer switch to be provided and connected to existing electrical panel in building. Pless Rd needs to include: Minimum 60KW, 277/480- volt three phase, diesel powered with 24-hour sub-base fuel tank with sound attenuated weather enclosure with main breaker and remote annunciator. Cast in place concrete pad. Connect new generator to new automatic transfer switch to be provided and connected to current electrical panel in building. Banks County Annex needs to include: new automatic transfer switch to be provided and connected to existing electrical panel in building. Connection to be provided near or withing 25 ft of parking lot and accessible by a portable generator. Any other need to make generator on-line and ready. Customer desires auto-start and stop and automatic weekly testing to ensure the critical facility is always ready.