The Work to be completed under this contract includes all labor, equipment and materials to construct an MS4 PRP subsurface infiltration basin with related inflow and outflow structures, pipes, and appurtenances; reconstruct the existing pedestrian trail; construct new sections of pedestrian trail; construct an on-street ADA parking space; construct two rain gardens and one infiltration trench stormwater BMPs in support of the trail work; and install project signage, trail signage, benches, and landscaping as shown on the Drawings and described in the Project Manual. The Work also includes soil erosion and sedimentation control measures, traffic control, and restoration. Work shall comply with applicable federal and state accessibility (“ADA”) requirements.