Specifications include, but are not limited to: Removals: - All plant material in red hatched areas to be removed and stumps ground - Weeping Cherry, Live Oak, and Palmetto Tree to remain - Concrete walkways and curb in red hatched area to be removed - All flower beds to be raked out completely and graded for positive drainage away from the building. Downspout Drains: - All gutter downspouts in project area to be piped underground with 4" sch 40 PVC to parking lot. If more then one downspout are piped together pipe size must double each time additional downspout is added. Entrance Plaza: - excavate, compact native soil, and pour 4,000 psi concrete with decorative saw cut joints and broom finish. (C) Fountain: - 2 tier cast concrete fountain, pond less basin with permeable pavers, 5,000 gph recirculating pump, basin overflow drain, and autofill (D) Concrete plaza and walkway extents (E) Concrete to begin flush with asphalt parking lot and ramp up per ADA standards (F) Curb to match existing sidewalk grade - Re-stripe Handicap Parking spot Plantings: (A) Front Foundation - 75 Lomandra 'Katrinus Deluxe' 1g - 7 Cleopatra Canna Lily 3g - 12 Shishigashira Camellia 7g - 10 Ginger Lily 3g - Pre-emerge all landscape beds prior to mulching - Chocolate Mulch 3" thick - Sod any areas disturbed by work (B) Raised Planter - Seasonal Color - Apply pre-emergent herbicide prior to mulch - Chocolate mulch 3" thick Pressure Wash: - Entire front entrance of school including walkways and canopy Establishment: - Provide hand watering of all new plantings until established