This project consists of the relocation of the existing entrance to the boat ramp and the relocation of the access road to the remote parking lot. The project is located on U.S. Highway 17 Business beside Belin United Methodist Church in Murrells Inlet, South Carolina. Work under this contract includes but is not necessarily limited to; earthwork excavation for a vegetated detention basin with outlet structure, installation of storm drain pipe and structures, construction of the relocated asphalt drive and roadway, demolition of the existing drive and road, establish permanent vegetation for all disturbed areas, and sediment and erosion control measures. The work performed under this Contract shall include the furnishing of all labor, materials, equipment and services, whether specifically mentioned or not, that is required to complete the Construction of the Work of the project. All requirements of the State of South Carolina and all pertinent administrative regulations shall apply to this project as if herein written out in full.