1. The intent of this package is to provide all labor to install all cabinets, countertops, sills, wood base trim, interior doors, door hardware, and specialties. 2. Install all wood or plastic laminate faced architectural woodwork, millwork, counters, windowsills, etc. as required by the contract documents. 3. Install windowsills and aprons. 4. Cabinet and shelving hardware are to be installed by this bid package. 5. All countertop supports to be installed by this scope. 6. Furnish all fasteners required for complete installation. 7. Install all accessories (i.e. grommets, supports, brackets, hardware, etc.). 8. Install all pantry shelves. 9. Install all closet rods and shelves. 10. Provide cutouts for plumbing fixtures, appliances, inserts, outlet boxes, and other fixtures and fittings. Coordinate cutout requirements with the Construction Manager. 11. Install all trim pieces, scribed pieces, or other fillers needed for a proper installation. 12. Install caulking or wood filler as needed for aesthetic purposes and as required for a complete installation. 13. Install all hollow metal doors, and hardware. 14. Install all toilet accessories as indicated in the Contract Documents. 15. Install all Mirrors. 16. Install all shower curtain rods. 17. Install all ADA Shower seats Identified in House Type 3 18. Subcontractor to provide temp protections on all countertops once installed (Cardboard or other). 19. Include all daily labor costs per Cherokee Nation TERO Law. 20. Include Davis-Bacon Wage rates and certified payroll. 21. Include all costs to provide performance, payment, and maintenance bonds if bid total exceeds $50,000.00.