Specifications include, but are not limited to: Task 1 - Preliminary Work and Site Evaluation Complete site survey and general assessment. Prepare a Drinking Water Source Assessment Plan (DWSAP) and submit to it to the Division of Drinking Water (DDW). Address any comments to gain DDW approval. Coordinate completion of necessary Water Quality sampling. Prepare a Low Threat NPDES permit application and process it through regulatory agency for approval. Abandon Existing well. Task 2 - Pilot Hole Construction and Initial Geophysical Surveys Review existing well’s drilling log and information. Prepare a set of construction specifications for completion of an 8-inch pilot hole at the proposed new well location. Provide Fair Oaks Water District with the list of qualified well drilling contractors. Based on the geophysical surveys, complete and present to the District a basis for design of the new well in a written Feasibility Memorandum outlining the potential yield, water quality, construction details and cost estimate for a new groundwater well at this location. Consideration should be given to ensuring that the new well will meet all drinking water standards without treatment and analyze impacts of potential treatment implementation if recommended. Task 3 – New Well Design and Construction Based on the Feasibility Memorandum developed in task 2, prepare a complete bid package consisting of a set of construction specifications and plans for drilling a new groundwater well at the site. Complete required environmental documentation. Prepare topographic survey. Provide FOWD with the list of qualified well drilling contractors. Post and distribute bid package. Assist the District with bid Addendums and Requests for Information from qualified contractors. Upon receiving bids, provide District with the written recommendations for awarding construction contract. Provide full construction and engineering project management during the construction of the new well through completion. This shall, at a minimum, include pre-construction and weekly progress meetings, submittal review, site monitoring, drill cutting and soils sample logging, well development, water quality monitoring, and review / approval of invoices for payment by the FOWD...