Specifications include, but are not limited to: Design work Includes site plan Cleaning/Dumpster Includes all cleaning/disposal Temporary Toilet Project Duration Demolition and Site Clearing/Preparation Survey and Elevation Certificates Building Lay-out/Easements/ Base Flood Elevation Earthworks Site and Foundation preparation works Foundation and Concreting Complete Footing/Foundation/Masonry @ Finished Floor Elevation Structural and Framing Works All fixtures, components and necessary works asreflected in the plan/specifications (including Floor Framing, Walls/Doors/Windows Framing, Roof and Ceiling Framing) Flooring All fixtures, components and necessary works asreflected in the plan/specifications (including sheating, underlayment and vinyl planks) Insulation All fixtures, components and necessary works asreflected in the plan/specifications (including Wall/Ceiling or Attic/Crawl Space) Walls All fixtures, components and necessary works asreflected in the plan/specifications for Dry Wall Installation (including sheating/Moisture Control/Engineered Wood) Roofing All fixtures, components and necessary works asreflected in the plan/specifications (including sheating/Asphalt Shingles -3 tab 20 years) Electrical All fixtures, components and necessary works asreflected in the plan/specifications (including connection to City Eletrical Line) Ceiling All fixtures, components and necessary works as reflected in plan/specifications (including sheating, underlayment and vinyl planks) Doors and Hardwares All fixtures, components and necessary works asreflected in plan/specifications