Specifications include, but are not limited to: provide the following material and services. The floor plan, electrical plan, Lecture hall reflected ceiling plan, bill of materials and fixture audit are provided as Attachments 1, 2, 4, 5 and 6. The lighting contractor is responsible for collecting accurate fixture and material quantities. The projected start date is May 20, 2024, and the awarded Contractor will work with OUHSC to provide a schedule detailing when and where the work will occur for progress and building scheduling purposes. 5.1.1.1 All fixtures being retrofitted must have old tombstones, ballasts, extra wires and components removed. 5.1.1.2 All work is to meet current adopted code requirements including, but not limited to, using green grounding screws, and plenum rated wire. 5.1.1.3 Only appropriately sized wire nuts will be used to make new connections. 5.1.1.4 Contractor will provide and put down plastic protection over equipment and all other delicate objects in work areas, along with high-visibility indicators to mark off the areas being worked in. 5.1.1.5 Contractors are to wear high-visibility shirts with a company logo throughout the project. 5.1.1.6 Any deviations from the scope of work must be approved by OUHSC in advance of change or modification. 5.1.1.7 Upon project completion, contractor will provide OUHSC with as-builts detailing the location of each Powpak and any other significant changes in AutoCAD (Both hard copy and digital CAD file). 5.1.1.8 Contractors are to coordinate with the Parking Office and acquire temporary parking while working on campus.