ROADWAY QUANTITY UNIT MOBILIZATION 1.000 LS CLEARING AND GRUBBING 1.000 LS REMOVAL OF BRIDGE (STA. 12+70) 1.000 UN REMOVAL OF BROKEN CONCRETE 100.000 SY REMOVE AND RELAY RIPRAP 150.000 SY UNCLASSIFIED EXCAVATION (FM) 1,080.000 CY CHANNEL EXCAVATION (FM) 350.000 CY EXCESS EXCAVATION (FM) 760.000 CY STRUCTURE EXCAVATION 500.000 CY GEOTEXTILE FABRIC STABILIZATION (TYPE III) NON-WOVEN, (AOS <0.43 mm) 400.000 SY TEMPORARY STREAM DIVERSION 1.000 EA GRANULAR MATERIAL, (CLASS 4, GROUP “C”) 567.000 TON CRUSHED STONE (SIZE 57) 270.000 TON 18” REINFORCED CONCRETE PIPE, CLASS III 32.000 LF RIGHT-OF-WAY MARKERS (TYPE I) 14.000 EA MAINTENANCE OF TRAFFIC 1.000 LS ADDITIONAL CONSTRUCTION SIGNS 0.000 SF EROSION CONTROL COMMERCIAL FERTILIZER (13:13:13) 0.850 TON AMMONIUM NITRATE 0.090 TON SEEDING 0.850 AC VEGETATIVE MATERIALS FOR MULCH 2.550 TON EXCELSIOR BLANKET 1,750.000 SY TEMPORARY SILT FENCE (TYPE I) (AOS 0.15 mm – 0.84 mm) 300.000 LF WATTLES, 20” 80.000 LF LOOSE RIPRAP, 300 LB. 835.000 TON GEOTEXTILE UNDER RIPRAP, TYPE V, NON-WOVEN AOS < 0.43 mm) 630.000 SY BOX BRIDGE BOX BRIDGE CONCRETE, CLASS “BB” 248.970 CY REINFORCEMENT 55,908.000 LB