PROVIDE SMOKE EXHAUST SYSTEM PERFORMANCE TESTING, AS DESIGNED, OF FOUR BUILDINGS ON URI'S KINGSTON CAMPUS AND REPAIRS OF RESULTS OF DEFICIENCIES. THE SMOKE CONTROL SYSTEMS ARE TO BE TESTED IN ACCORDANCE WITH THE RI LIFE SAFETY CODE & NFPA 92: EDITIONS EACH BUILDING HAS A DEDICATED SMOKE CONTROL SYSTEM AND REQUIRES SEMI-ANNUAL TESTING (2 TIMES PER YEAR). THE SERVICE SHALL INCLUDE, BUT IS NOT LIMITED TO, AIR FLOW SAMPLING/MEASURING, VISUAL INSPECTION OF ITEMS AS REQUIRED BY THE PREVIOUSLY APPROVED TESTING DOCUMENTS, AND PROVIDING A FINAL COMPLETE TEST REPORT OF EACH SYSTEM. PLEASE SEE ATTACHEMENTS FOR EACH BUILDING AS FOLLOWS: GARRAHY HALL - ATTACHMENT A WILEY HALL - ATTACHMENT B EDDY HALL - ATTACHMENT C CBLS - ATTACHMENT D THE WORK HOURS FOR THIS PROJECT WILL BE M-F 8:30AM - 4:30PM NON-STATE HOLIDAYS. THE UNIVERSITY WILL PROVIDE ONE FIRE ALARM TECHNICIAN TO ACTIVATE AND DISABLE THE FIRE ALARM AS NEEDED. WINNING BIDDER WILL SUPPLIER AIR BALANCERS. THE WINNING BIDDER SHALL PROVIDE: 1. A TESTING PLAN IN ACCORDANCE WITH THE PREVIOUS APPROVED DESIGN FOR EACH BUILDING. THIS PLAN MUST BE PROVIDED PRIOR TO THE START OF WORK. 2. ALL TOOLS AND EQUIPMENT, INCLUDING STAGING, LADDERS AND LIFTS NEEDED TO PERFORM THE TESTING. (PLEASE NOTE THAT GARRAHY, WILEY AND EDDIE HALLS HAVE 40' CEILINGS.) 3. A FINAL TESTING REPORT THAT INCLUDES DESIGN VALUES AND MEASURED VALUES. 4. A STAMPED COPY OF THE REPORT FROM A RI REGISTERED DESIGN PROFESSIONAL.