The City of Mercedes is seeking written responses to a Request for Qualifications (RFQ) to retain an Engineering firm for design services necessary for a Groundwater Availability Study and a Groundwater Supply Well to be located at a site to be determined as described in scope of services consistent with standards, procedures, and best management practices in Texas. The well will have a capacity to pump approximately 1400 gallons per minute (GPM) of potable water. The well shall be located, designed and constructed in accordance with applicable City, State, and Federal Standards. This well will be associated with City of Mercedes Water Plant and the engineering for the facilities (piping, valves, controls, etc.) to connect the well to the plant are all inclusive to this scope.