1 C-100-14.1 Contractor Quality Control Program (CQCP) (Schedule II) 1 LS 2 C-102-6.1 Storm Water Pollution Prevention Plan (Schedule II) 1 LS 3 C-105-6.1 Mobilization (Schedule II) 1 LS 4 GTP-10.01.1 Location of Underground Utilities (Schedule II) 1 LS 5 GTP-20.04.1 Airfield Safety and Security (Airside Work - Schedule II) 1 LS 6 GTP-30.01.1 Riprap Underlain with Geosynthetic Filter Fabric (D50=6", T = 12") 179 SY 7 P-152-4.1 Unclassified Excavation 3000 CY 8 D-701-5.1 24-Inch RGRCP Storm Drain, Class III 308 LF 9 D-701-5.2 30-Inch RGRCP Storm Drain, Class III 140 LF 10 D-701-5.3 42-inch RGRCP Storm Drain, Class III 328 LF 11 D-751-5.1 Catch Basin (MAG Std Det 535, Type F) 2 EA 12 D-751-5.2 Catch Basin (MAG Std Det 535, Type H) 1 EA 13 D-751-5.3 Concrete Apron (ADOT Std Det C-15.80 - Dimensions Modified per Plan) 3 EA 14 D-751-5.4 24-Inch Flared End Section (MAG Std Det 545) 1 EA 15 D-751-5.5 Storm Drain Manhole (MAG Std Det 520 & 423-2) 1 EA 16 D-751-5.6 Connect Existing 42-Inch Storm Drain to New Catch Basin 1 EA