Specifications include, but are not limited to: 1. Demo work: Contractor will ensure buildings, supporting foundations, manmade surfaces, fences, fence post concrete, debris, be removed from property and disposed of. There are 6 areas excluded from demolition which are identified on drawings. Items excluded are 3 roads, 1 parking area, 1 large concrete pad, and 1 fence (Gainesville Excluded Demo Items Map highlighted red). ‐ Contractor will acquire any required permits. ‐ Contractor will ensure all required inspections are completed. ‐ Contractor will ensure locate service is completed and documented prior to demo. ‐ Contractor will abate and dispose of the asbestos identified in the Pb03 Environmental Monitoring LLC survey dated 20 Sept 2023. Contractor will ensure they follow the EPA’s National Emission Standard for hazardous Air Pollutants (NESHAP) regulations and the Florida Department of Environmental Protection (FDEP) Asbestos program guidance in abating identified areas containing asbestos. 2. General Requirements: ‐ Contractor will shutoff water and cap at both backflow preventors. ‐ Contractor will locate and cap sanitary sewer line 50 feet from current facility. ‐ Contractor will ensure gas is shutoff and terminated coordinated with gas company. Intent is to have termination located away from the buildings being demolished. Termination at or near the property line is ideal scenario. ‐ Contractor will ensure electric is disconnected at electric meters/ step down transformers located on the power poles. The intent is to ensure there is no electricity on or near the buildings to demolished. ‐ Contractor will remove all overhead lights and light poles. ‐ Contractor will remove 1 dead pine tree stump located near trailer (BLDG 0003) ‐ Contractor will remove wood pile located near entrance, and misc. picnic tables throughout site. ‐ Contractor will ensure that the lot near the demo area will be graded in similar condition as surrounding area, trash removed, and ensure no evidence of structure remains when project is complete. ‐ All attempts should be made to recycle as much demo material as possible. 3. Excluded Demo Items: a. Northeast facility entrance road 339 sy. b. North middle facility entrance road 491 sy.