Specifications include, but are not limited to: A. Install framework, fabric, accessories and gates in accordance with ASTM F567. B. Line Post Footing Depth Below Finish Grade: ASTM F567; 30-36 inches below grade. C. Terminal Post Footing Depth Below Finish Grade: ASTM F567; 30-36 inches below grade unless otherwise specified by Owner’s representative. D. Gate Post Depth Below Finish Grade: ASTM F567; 36-48 inches below grade as specified below. 1. All gates 4-6 ft. in length shall have a minimum of a 3-inch terminal post installed on both ends with bracing. Each post shall be wet set-in concrete in a minimum excavated hole size of 10-inch diameter by 36 inches deep. 2. All gates 6-13 ft. in length shall have a minimum of a 4-inch terminal post on both ends with bracing. Each post shall be wet set-in concrete in a minimum excavated hole size of 12 inch diameter by 36 inches deep. 3. All gates 13 foot and greater in length shall have a minimum of a 6-5/8 inch terminal post on both ends with bracing. Each post shall be wet set-in concrete in a minimum excavated hole size of 12 inch diameter by 48 inches deep. E. All posts shall be capped and spaced no more than 10 ft. on-center. F. Natural Turf Installation: Wet set-in concrete filled footings all terminal, line and gate posts. Footers are to be filled within 1inch of existing grade, top off footings above existing grade with three – four inches of excavated soils with a mounded top to shed water. G. Hard Surface Installation: Wet set-in concrete filled footings all terminal, line and gate posts. Footers are to be filled to match existing hard surface with a ½ - ¾ inch crown on top to shed water. H. All fencing 8 ft. or above will be installed with a middle rail with fabric tied every 16”. I. Brace each gate and corner post to adjacent line post with horizontal center brace rail. Install brace rail one bay from end and one bay at gate posts. J. Install top rail through line post tops and splice together by using swedged sections of 1-5/8 inch pipe. K. Install center and bottom brace rail on corner gate leaves. L. Install 7 gauge galvanized or 6-gauge black vinyl bottom tension wire prior to stretching fabric and attach to post with ties. Secure tension wire to fabric with 12- ½ gauge hog ring fasteners every 24 inches. M. Do not stretch fabric until concrete foundation has cured 1-3 days. N. Place fabric on the outside of posts and rails unless otherwise specified by Owners Representative. O. Stretch fabric between terminal posts or at intervals of 100 feet maximum, whichever is less. P. Position bottom of fabric 2 inches above finished grade unless otherwise directed...