Work shall include but not be limited to: 3.2.1 Removal or relocation of any pre-existing equipment if needed to facilitate new installations (units/equipment are to be turned over to PRT). 3.2.2 All necessary software, hardware, control consoles, equipment, and other deliverables required to integrate into the pre-existing computer equipment and provide networking shall be inclusive of this procurement. 3.2.3 Installation and testing of new unit. Contractor is responsible for all electrical/software/hardware and all related work incidental to this scope. 3.2.4 The Contractor shall provide four (4) each additional ink cartridges of all colors and shall provide one complete set of replacement cutting blades for the cutter. 3.2.5 The Contractor shall include in the bid any stands or supports needed to fully support machines as needed.