Specifications include, but are not limited to: 10.0 CY; TOPSOIL FURNISH AND PLACE, 4": 210.0 SY; EROSION CONTROL BLANKET: 210.0 SY; AGGREGATE BASE COURSE, TYPE B, 4": 185 SY; BIT. MATERIALS (COVER AND SEAL COATS): 45.0 TON; SEAL COAT AGGREGATE: 350.0 TON; PCC DRIVEWAY PAVEMENT, 6 INCH: 20.0 SY; PCC SIDEWALK 5 INCH: 1,650 SF; DETECTABLE WARNINGS; 290.0 SF; DRIVEWAY PAVEMENT REMOVAL: 20.0 SY; SIDEWALK REMOVAL: 1,465.0 SF; AGGREGATE WEDGE SHOULDER, TYPE B: 140.0 TON; VALVE BOXES TO BE ADJUSTED: 6.0 EACH; REJUVENATING AGENT; 5,275.0 GALLON; HOT-IN-PLACE RECYCLING - SURFACE RECYCLING: 26,370.0 SY; CLASS D PATCHES, 4 INCH: 1,280.0 SY; BIT. MATERIALS (FOG SEAL): 48,330.0 POUND; SEEDING, CLASS 1A (SPECIAL): 210.0 SY; REMOVE AND REPLACE CURB AND GUTTER (SPECIAL): 420.0 FOOT; DRAINAGE AND UTILTY STRUCTURES TO BE ADJUSTED: 36.0 EACH; DRAINAGE AND UTILTY STRUCTURES TO BE RECONSTRUCTED: 2.0 EACH