Specifications include, but are not limited to: 1. This job will be turn-key to include: - Moving Furniture - Removing current flooring - All adhesives and patch of any kind need to be removed - Concrete floor should be skim coated with a commercial leveler - All expansion joins should be chinked and waterproofed - Apply leveling compound as needed - Installing new 12’x12’ Armstrong VCT or LVT (alternate) where required - Installing new carpet squares – spec – Fifth & Main style Authentic, color to be decided - Installing new 4” 1/8 thickness rubber cove base 2. Contractor is responsible for all measurements during the mandatory pre-bid meeting. 3. ALL work will being in the summer (June 3) and must be completed by August 1, 2024. Schools and Job Specifications: A. Chesnee High School: Remove and replace carpet in band classroom and media center. B. Oakland Elementary School: Remove and replace carpet in media center. C. Boiling Springs Elementary School: Removing vinyl floor tile and carpet in kindergarten classrooms and replace with VCT or LVT floor tiles and carpet squares.