Specifications include, but are not limited to: : This project will consist of the placement of a warm mix asphalt overlay with cold-inplace recycling on CR 19; also included in the project is milling in identified areas, full depth restoration in identified areas, placement of shoulder back up material, inventory and placement of pavement marking stripes; and providing all required Work Zone Traffic Control. The Contractor shall furnish all materials, equipment, tools and labor of every kind required to prepare the surface and overlay the pavement and all other incidental work as detailed in these contract documents in the most substantial and workmanlike manner, and do everything required by the Contract Documents as defined herein.