Specifications include, but are not limited to: The required services to be provided are to repair and/or replace the concrete sidewalks at the front of the HHSC Region 04 – Mt. Pleasant, Texas Facility. The Contractor shall assure all underground utilities are properly marked and located. Concrete to be removed shall be saw cut a minimum of three inches through the joint of the adjacent slab. Demolition shall be done in a manner to avoid damage to the building foundation and/or remaining sidewalks that are to remain in place. The Contractor shall take care to avoid damage and spalling of adjacent slabs due to inefficient demolition methods. The Contractor shall avoid damage to existing structures, vegetation, private and state-owned property. The Contractor shall assure acceptable subgrade and that the sidewalk meets all ADA requirements. Any concrete that cracks due to improper placement shall be replaced at no cost to the state. The Contractor will furnish any dumpsters or other receptacles required for the storage and transport of trash. All trash will be placed in dumpsters and will not be accumulated on the facility grounds.