Specifications include, but are not limited to: Installation of 4 segments with a total of approximately 5,400 linear feet of 12-inch PVC pressure irrigation pipeline connecting to the existing system on the east side of United States Highway 89 (US 89). The Work includes installation of fittings, air valve vaults, drain vault, thrust restraints, service connections including several via trenchless installations across US 89. Other construction activities include connections to the existing pressure irrigation system, excavation, backfill, traffic control, and restoration of existing asphalt roadway, landscaped park strips, curb and gutter, pedestrian ramps, asphalt trail, and driveways affected during construction.