Specifications include, but are not limited to: External inspection and photograph. Flow Check Sumps, BSI and take Oil Samples Disassembly of GT Into module form3. For all components and modules, perform inspections, and advice of any repairs or replacements required as non-conformance with OEM specification. Inform OMPA as soon as practical and provide quote for repair or replacement. Work scope per IRM GEK 98492 and/or OEM Engineering standard shop procedures. Engine Induction and Dis-Assembly - A set of incoming pictures shall be taken to document condition of receipt. Pictures shall be provided to OMPA as part of the final report. AIR COLLECTOR ASSEMBLY - Visual inspect. Perform any NDE inspections per GE guidelines. VARIABLE BYPASS VALVES - Visual inspect. Inspect VBV Doors/seals and re-quote as required. Inspect linkages, hardware, and test associated actuators. Reassemble using new consumable hardware as required...