Specifications include, but are not limited to: Breakroom: Install new cabinet sink, sink and disposal at breakroom with associated plumbing, electrical and permits, ceiling Drywall repairs to hard lid at floor below as well as any disturbed walls in the breakroom, paint shall be corner to corner of ceiling below and any disturbed walls, contractor shall provide GPR for core hole for drain, water lines etc. Seal core hole/s after pipe drain and/or waterlines are ran through.; Public hallway 2nd floor: Removal of wallpaper, fabric wall paneling from hallway walls, patch/repair drywall as necessary texture and paint corner to corner. Replace exiting light fixtures with new LED light fixtures to match 3rd floor, install new ceiling tiles to match 3rd floor, replace flooring on 2nd floor public hallway to match 3rd floor type, style and color. Remove existing water fountain and Install new ADA water bottle filler. (Elkay model)