Specifications include, but are not limited to: Your price should include the following: Seal off the decontaminated in the entire attic area. Removal of all insulation in the attic area which is old batt insulation 65x655 area (floor only). Hepa vacuum the entire area. Sanitize entire attic area with concroblum botanical disinfectant. Hepa vacuum a second time. Appl fungicide to prevent future mold growth using anabec spray or something similar to. Remove all existing ceiling tiles on second floor of building and dispose of properly. Replace all ceiling tiles on second floor with new tiles Armstrong 705A Tiles 2x4 Replacement of all flex duct working attic space 9” 250’ and 18” 140’ using the same R-Value Cleaning of all solid duct work in attic space approximately 120’ Run air scrubbers for 24 hours in area. Install new insulation throughout the attic using Owens Corning R19 faced floor area only. The Contractor is responsible for all cleanup and removal of all debris from the premises. All work shall be performed in compliance with EPA, llCRC-S520 standards. Price should include insurance and bonding as well.