Specifications include, but are not limited to: The proposed work consists of reconstructing or partially resurfacing the roadway with new HMA pavement, curb and gutter, sidewalk, lighting installation, storm sewer improvements, and other miscellaneous items of work. Roadway reconstruction and resurfacing include 4,700 tons of HMA binder course, 2,800 tons of HMA surface course, 17,000 sq yd of HMA base course, 43,000 sq yd of aggregate base course of various depths, 9,500 feet of curb and gutter removal and replacement, 63,000 sq ft of sidewalk removal, and 98,300 sq ft of PCC sidewalk of various depths. Lighting installation consists of 120 lighting units, fixtures, and associated conduit. Storm sewer installation includes 900 feet of storm sewer pipe of various sizes and structures to be adjusted/ constructed, along with 10,500 sq yd of parkway restoration ( sodding), and other incidental and miscellaneous items of work.