Specifications include, but are not limited to: Operate and maintain groundwater collection system (collection trenches, manholes, remediation building and associated equipment including routine inspections by sub-contractors) and monitoring well network - Travel Costs (report miles), Labor & Materials ; Monthly Process Compliance Monitoring - Effluent monitoring per Appleton Permit 21-21 (Table 2), Monthly Influent Monitoring (Hach) (1st Mon) (Table 2A) and Monthly Total Flow Meter Readings (3rd Mon) - Materials & Lab ; Local Limit Compliance Monitoring per Appleton Permit 21-21 (June) (Table 2) - Materials & Lab ; Semi-annual compliance reporting to Appleton POTW (October 15th and April 15th) (Table 3) – Labor ; Semi-annual compliance reporting to Appleton POTW (January 15th and July 15th) (Table 3) – Labor ; Annual Well Inspection & Water Level Measurements (Sept 2025) (Table 4) - Travel Costs (report miles), Labor, Materials ; Groundwater Monitoring Point Sampling (Sept 2025 event) (Table 4) - Travel Costs (report miles), Labor, Materials & Lab...