Specifications include, but are not limited to: • Cleaning, painting, and finishing of all assets within the designated area. • Coordination with City Representatives for any work involving lift equipment and traffic control to ensure safety. • Acquisition of all permits for road closures. • Provision of lift equipment and protection of all public and private property throughout the project. • Daily cleanup with only wet paint signs and barricades left overnight as needed. • Identification of areas needing repair or welding and reporting to the Beautification, Arts, and Sciences Coordinator for further action. • Reporting of abandoned bikes at bike racks, as required. • Washing of assets with Prep88 and low-pressure sprayer, brush, or roller, followed by sanding of painted surfaces to promote proper adhesion of topcoats and finish coat. • Paint specification: Prep 88 Wash Primer (or comparable), American One Epoxy Tie Coat Primer (where necessary), and two coats of PSX Finish Coat (Acrylic Polysiloxane) in Municipal Green color.