The scope of the Project is to construct platforms at 26 lift stations in Covington to a height 3’ above the base flood elevation per FEMA elevation requirements for critical infrastructure, and to relocate the control panels, emergency generators and related equipment on top of each platform, make necessary changes to prevent I&I into lift station wet well pits during flood conditions, and install emergency generators at scoped lift stations that don’t currently have one if budget allows and if requested by the City. Relocating the lift station control panels and emergency generators and related equipment to 3’ above base flood elevation will allow lift stations that would otherwise cease to function during a flood event to continue to function thereby preventing the discharge of untreated sewage during flood events and protecting water quality. The plans & specifications shall address each lift station site to the satisfaction of the City Engineer. The construction will be publicly bid to procure a contractor to furnish and install the platforms and relocate the equipment. All procurements will be made following applicable local, state and federal public bid and procurement laws. The City Engineer and Capital Project Manager will serve as project manager with the cooperation and assistance of the Public Works Director.