Specifications include, but are not limited to: Principal components of the project include the following: REMOVE SEWER PIPE (STORM) 516 LF; REMOVE BITUMINOUS PAVEMENT (DRIVEWAYS) 1,404 SY; SAWING BIT PAVEMENT (FULL DEPTH) 2,014 LF; SPRINKLER SYSTEM ALLOWANCE 1 LS; HAUL & STOCKPILE EXCESS MATERIAL (LV) 561 CY; HAUL & DISPOSE OF EXCESS MATERIAL (LV) [VOG ONLY] 1,242 CY; AGGREGATE CLASS 5 MOD (DRIVEWAY) 99 TON; AGGREGATE SHOULDER (FROM EXCESS RECLAIM) 548 CY; BIT. DRIVEWAY TYPE SP 4.75 WEARING COURSE MIXTURE (2,B) 1,551 SY; FULL DEPTH RECLAMATION 46,095 SY; MILL BITUMINOUS SURFACE 3,020 SY; BITUMINOUS MATERIAL FOR TACK COAT 2,568.5 GAL; TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 4,334.3 TON; TYPE SP 12.5 NON WEAR COURSE MIXTURE (2,B) 5,779.1 TON; 12"-24” RC PIPE APRON 20 EACH; 12"-24” RC PIPE CULVERT 352 LF; TURF ESTAB. (EROSION CONT. MAT CAT 3 & SEED MIX 25-141) 1.21 ACRE.