Specifications include, but are not limited to: Architectural / Engineering Services 1. Collect Project criteria from the Treasurer and verify all required programming needs. 2. Prepare a Project design that minimizes impact on adjacent properties as outlined in the survey attached as Exhibit D. 3. Prepare a Project design schedule to be used during all phases of the Project, targeting completed remediation and protection of the East Wall by October 31, 2024. 4. Prepare and present conceptual designs, layouts, and final design options for review and approval by the Treasurer. 5. Develop an estimated cost for construction, including removal of Winter Protection. 6. Prepare detailed engineering and construction drawings that will serve as the basis for both bidding and construction by a general contractor and any subcontractors. 7. Submit final plans and drawings to local governmental entities, as necessary, in order to obtain all legally required approvals, licenses, and/or permits. 8. Assist the Treasurer with preparation and distribution of construction bid documents. 9. Assist the Treasurer with the selection of contractors, where appropriate, including making such selections through the use of existing statewide master contracts, where practicable. 10. Assist the Treasurer with bid review and preparation of all necessary construction contract documents, including any American Institute of Architects contract documents. 11. Perform regular site observation of all contractors and subcontractors performing work under any resulting construction or related contract for the Project, and employees or personnel of such contractor and subcontractors, for adherence to design and construction specifications. 12. As requested by the Treasurer, opine on all change order requests as may be submitted by the awarded general contractor as well as any other contractors or subcontractors to the Treasurer for approval. 13.Respond to questions and issues in a timely manner that arise during design and construction. 14. Assist in obtaining all necessary permits from local government entities, and any similar licenses or permits that may be necessary or appropriate for occupancy. 15. Prepare and submit to the Treasurer all “as-built” drawings at the conclusion of the Project.