1. See floor plans for area of work and keynotes. 2. Remove existing carpet and wall bases. 3. Install new carpet (approximately 600sf) and rubber wall base. Match existing rubber wall base. Color to be determined. See scope of work for carpet selection. 4. Install new LVT(approximately 6000sf) and rubber wall base. Match existing rubber wall base. Color to be determined. See scope of work for LVT selection. 5. No carpet removal and replacement in office A10.03 only. New paint and wall base replacement only. 6. Paint all walls in suite (field color). Color to be determined 7. Paint all door frames in suite. Color to be determined 8. Paint wall accent color 1. Color to be determined. See image for paint pattern. 9. Paint wall accent color 2. Color to be determined. 10. Relocate furniture, refrigerator and copiers and 65 boxes (18”Lx12”Wx10”H) within space and/or to classroom A21 to accomplish work. Relocate back to original location at area of work at the end of construction. 11. Relocate existing refrigerator to this location. 12. Install new signage labeled A08 and A10.04 to match room number on floor plan. Match existing room signage. 13. Install wood chair rail. Stain color to be selected. See image for additional info. 14. Install one clear corner guard to match image. 15. Patch existing monitor bracket holes and prep for paint. 16. Hide TV monitor wires in wall, 5 locations total. 17. TV monitor brackets will remain (6 total). Contractor should remove these before painting and reinstall after painting. 18. DPS will disconnect and reconnect all power and data from furniture and copiers before and after they are moved. 19. Provide approximately 100sf of carpet and 100sf of LVT flooring for attic stock. 20. DPS will remove all personal items, wall hangings and tv monitors. Where furniture and/or lateral file drawers can be locked, personal items will not be removed. 21. Replace HVAC filters in unit serving area of work 22. Ensure all applicable codes and ADA/ADAAG/TAS regulations are followed. 23. Provide a minimum one (1) year Warranty on all installation work. 24. Provide turnkey project as indicated on the drawings and as required for complete project.