Specifications include, but are not limited to: Install 144-strand fiber optic cable jet-air (pulling if necessary); Install 288-strand fiber optic cable jet-air (pulling if necessary); Mobilization charge for projects greater than 500 feet, including transportation cost for the cable, One-Time Charge Per Project; Install 144-strand fiber optic cable jet-air (pulling if necessary); Install 288-strand fiber optic cable jet-air (pulling if necessary); Mobilization charge for projects less than or equal to 500 feet, including transportation cost for the cable, One-Time Charge Per Project; Furnish two (2) HDPE conduits, one orang and one blue, of 1.25" internal diameter, and install said conduits underground, generally 42", via directional bore. Furnish and pull a 11-gauge copper locate wire in the bore for GSOC locating purposes...