Specifications include, but are not limited to: Utah Division of Wildlife Resources (UDWR) is acquiring services in this contract to provide 7.5 hours of on-site helicopter time to transport guzzler tanks, personnel, and various supplies to 2 sites in Box Elder County, Utah. Bids should be submitted on a per/hour basis. This contract will be bid on an average per hour and total project cost basis. Per hour and total bid prices will include all mobilization and operation costs. There will be no fuel surcharges or adjustments negotiated. The contract will be awarded based on bid price, prior performance as provided by the bidder and will be evaluated and awarded at the sole discretion of the government. SITE SPECIFICS Location and Description: The project area consists of one staging area (landing zones) in Box Elder County, Utah (See attached maps). Elevation of the LZ1/Fuel staging area is 4,200 feet and the two drop sites associated with the LZ range from 4,900 to 5,200 feet elevation with a flight distance from 3.5 and 4.2 miles to each drop site. Staging area can be changed if needed Each drop site requires 2 trips for personnel and 3 trips of long-lining materials. This project has 2 drop sites operating out of 1 landing zone. Airspace will only be cleared for one day between May 13th and 17th 2024, we will be coordinating with Hill Airforce Base to determine when flight is cleared. Contractor will need to be available for flight during any day between May 13th and 17th. Vicinity maps showing the project sites are attached.