Specifications include, but are not limited to: The Project includes the following Work: Division 1 – Installation of UV-cured CIPP liner throughout approximately 3,655 LF of sewer line (ranging in size from 8” to 18” diameter), the rehabilitation of 140 VF of manhole structure, repairs made to the mainline at 31 locations as shown on the plans, the reconnection and rehabilitation of approximately 72 private lateral sewer lines (1,100 LF) and sewer cleanouts, and locating, raising, and rehabilitation of 1 manhole, and all associated asphalt and curb and gutter restoration associated with construction. Division 2 – The replacement of approximately 11,550 LF of gravity sewer line (ranging in size from 8” to 18” diameter), the removal and replacement of approximately 470 VF of concrete manhole structure, the installation of 84 manhole frames and covers, the installation of 60 LF of concrete encasement for stream crossings, and the replacement, reconnection and installation of approximately 175 private lateral sewer lines and sewer cleanouts and 3,500 LF of 6” lateral sewer line, and all associated asphalt and curb and gutter restoration associated with construction. Division 3 – The replacement of approximately 2,600 LF of 18” gravity sewer line, the removal and replacement of approximately 95 VF of concrete manhole structure, the installation of 9 watertight and 3 standard frame and covers, the reconnection of 7 gravity mains, and the replacement, reconnection and installation of approximately 15 private lateral sewer lines and sewer cleanouts and 480 LF of 6” lateral sewer line, and all associated asphalt and curb and gutter restoration associated with construction. Bids are requested for the following Contract: Phase 1 Sewer System Improvements Project SSES Step 2, VCWRLF ID: C-515741 Bids will be received for a single prime Contract for each individual Contract. Bids shall be on a lump sum and unit price basis.