Specifications include, but are not limited to: MCPS intends to hire a consultant engineering firm to complete the regular inspection, as defined by the Bureau of Dam Safety, of the Perrineville Lake Dam. This regular inspection is now overdue and should be completed as soon as reasonably possible. The selected Consultant shall prepare a draft Regular Inspection Report for review and comment by MCPS. MCPS comments and revisions shall be incorporated into the Final Regular Inspection Report. After submission of the final report to NJDEP, the Consultant shall be available to respond to or address any reporting deficiencies identified which are required for NJDEP to accept the report as complete. Additional studies, repairs, and analysis are not required as part of this scope of work. An Emergency Action Plan (EAP) and Operations & Maintenance (O&M) Manual have previously been prepared and subsequently approved by NJDEP. As part of the regular inspection, the Consultant shall review, update, and revise, as necessary, the existing EAP and O&M Manual. The Consultant shall update the points of contact, as provided by MCPS, and review the documents for accuracy and completeness. MCPS will print and distribute the updated EAP and O&M Manual to responsible parties. Updated flood mapping is not included in this scope of work.