Specifications include, but are not limited to: • Asbestos Abatement o First Floor - Cafeteria (Scope Sheet 2 and Drawing ASB-1) o Second Floor - Classrooms 202 and 205 (Scope Sheet 3 and Drawing ASB-2) o Second Floor - East Corridor by Girls’ Toilet Room (Scope Sheet 4 and Drawing ASB-2) o Second Floor - East Girls’ Toilet Room Pipe Chase (Scope Sheet 4 and Drawing ASB-2) • Lead-Based Paint Mitigation and Surface Stabilization for Renovation Painting o First Floor - West Girls’ and Boys’ Toilet Rooms, and Adjoining Foyers (Scope Sheet 5 and Drawing LBP-1) o First Floor - West Corridor by Girls’ Toilet Room (Scope Sheet 6 and Drawing LBP-1) o Second Floor - West Girls’ and Boys’ Toilet Rooms, and Adjoining Foyers (Scope Sheet 7 and Drawing LBP-2) o Third Floor - West Girls’ and Boys’ Toilet Rooms, and Adjoining Foyers (Scope Sheet 8 and Drawing LBP-3)