Specifications include, but are not limited to: • Furnishing and installation of 351 tons of asphalt sidewalk that will be placed along approximately 3,020 feet of Ben Walters Lane from Lake Street to East End Road. • Furnishing and installation of 3,160 feet of curb and gutter, including 7 curb ramps. • Removal of 3,566 SY of pavement, 417 LF of culvert pipe, 226 LF of curb and gutter, three fire hydrants, one pressure relief valve vault, and ten bollards. • Performing 4,200 CY of excavation. • Backfilling with 6,286 CY of type III classified fill and placing 372 CY of leveling course. • Furnishing and installation of 8 CMP culvert pipes including 349 LF of 18-inch culvert and 52 LF of 24- inch culvert. This shall include end sections for 18 and 24 inch culverts. • Installation of new signs and salvaging of existing signs. • Furnishing and installation of 7 catch basins. • Reconstruction of 12 driveways and 2 public approaches. • Furnishing and installation of 21 MSF of topsoil and seed.