Specifications include, but are not limited to: 1. Abatement of gypsum board off one side of existing perimeter walls. The joint compound has been tested and confirms the joint compound contains asbestos. The removal of the cove base is included in the scope of work. Noted as (X) on the attached floorplan sketch. 2. Abatement of gypsum board off both sides of existing walls, for the extent of the gypsum board above the acoustic ceiling. The joint compound has been tested and confirms the joint compound contains asbestos. The removal of the metal studs and the cove base are included in the scope of work. Noted as (X1) on the attached floorplan sketch. 3. Abatement of the black mastic under the carpet of the entrance foyer / waiting room, GE0, of the existing test area. Noted as (Z enclosed by an oval) on the attached floorplan sketch. 4. The removal of the carpet in all other areas, per the attached floorplan sketch. Noted as (a Z ….and…. a Z enclosed by a circle) on the attached floorplan sketch. 5. The removal of the Vinyl Composition Tile (VCT) found underneath the carpet of area noted GE1 on the attached floorplan sketch. The vinyl tile has been tested and does not contain asbestos. 6. If by chance there is a field discovery of suspicious VCT located under the walls that have been removed, the tile will be tested. If the tile analysis concludes it is asbestos containing, the abatement of the discovered VCT will be added to the project scope via a Construction Change Order. 7. Secure the proper abatement permitting from SC DHEC. 8. Provide chain of custody forms for the disposal of all abated materials 9. Leave a clean and habitable space upon completion of the abatement exercise.