Specifications include, but are not limited to: Perform 2 passes of maintenance/repair of entire 8 mile road system within a 1 year period. One year period will start from the date of job award. First pass to occur between October-December, and second pass between April-May.; Each pass will include the following: Grade road to proper angle for proper water runoff to minimize impact of erosion.; Repair and maintain water diversions (throw-aways, water bars) where needed: - Repair/maintain existing water diversions where needed at top crown of slope 20% or more downhill to reduce drainage on slope - Repair/maintain existing water bars where needed at the base of any slope 20% or more - Repair/maintain existing water throw-away features that were constructed every 200 feet for road slope 10% or less.; Maintain/repair existing water diversions.; Fill ruts in road where erosion has occurred, may use dirt aggregate material that is available on-site.; Fill sections of road where exposed rocks are present with dirt, base course or rock dust material.; Maintain and repair roadside ditches and drainages that show signs of deep erosion.