Specifications include, but are not limited to: 3.1.1.1 Demolition of residential structures, buildings, and other surface and sub-surface structures as located within limits of the property located at 1417 East Main Street in Murfreesboro, Tennessee 37130. In addition to the requirement to remove all structures, remove all manmade appurtenances from the specified project site whether specifically shown on the drawings or not. This includes, but is not limited to, such elements as sections of miscellaneous posts, barbeque pits, and the like. 3.1.1.2 Buried structures, foundations, basements, heating oil tanks, and miscellaneous items located within limits of the residential structure. This also includes any septic tank(s). 3.1.1.3 Concrete, Asphalt, and Stone located within the properties except for public sidewalks and curbs. Several wheel stops are located on the property at the edges of the gravel parking area. These structures and the associated stays are to be removed with the exception of four wheel stops to line the old drive at street sidewalk. 3.1.1.4 Remove any stumps, bushes, and shrubs immediately surrounding the residential structure to complete the demolition work. No other trees or bushes within the property lines are to be disturbed or removed. Trees are to be trimmed by a professional to allow machinery access to the structures. Removal of the tree log on the north side of the property also needs to be completed. After all demolition has been completed the grounds shall be leveled to an even plane. 3.1.1.5 Utility service lines to the service pole or within 10 feet of the property. Water, telephone and gas lines may also be present on the property. All utilities serving the residence will need to be capped and removed. 3.1.1.6 Protect neighboring property to remain in place. 3.1.1.7 Protect the public. Place barrier fencing or similar material around the demolition site to prevent accidental entry into the excavated area(s) before leaving the site for the day until demolition is complete. 3.1.1.8 Maintain dust protection. 3.1.1.9 Backfill excavations with a clean, soil fill compacted to 95% standard proctor for the material. Fill to match existing grade. 3.1.1.10 Clean-up site, grass, and bare soil surface areas. Reseed and straw following cleanup. Once all grounds have been strawed and seeded, place wheel stops at the driveway above the sidewalk to prevent parking.